Abstract
At present, hydro power as renewable energy is not able to fully participate in the advantage of state-supported feed-in tariffs for green energy. Regular electricity prices are rather low for several years already – with dramatic impacts on hydro power projects as no new investments are made. These days, in order to realize a green field project in Central Europe, new ideas and cost-optimized power plant layout designs have to be developed which differ significantly from conservative approaches. Hydraulic design aspects have to be analyzed in depth and particular attention has to be paid to cost drivers. Each component must not be seen as single simplified component but has to be analyzed cross-linked to all the other components. The overall dimensions have to be reduced in order to reasonably influence excavation costs whereby the intake inflow condition still has to reach a satisfactory level. Additionally, a minimization of the construction depth has to be considered as well. For a new hydro power plant on the river Salzach a thorough investigation of the main components was performed during the project development phase.
Originalsprache | englisch |
---|---|
Seiten | 1-11 |
Seitenumfang | 11 |
Publikationsstatus | Veröffentlicht - 25 Juli 2019 |
Veranstaltung | Hydrovision 2019 - Oregon Convention Center, Portland, USA / Vereinigte Staaten Dauer: 23 Juli 2019 → 25 Juli 2019 |
Konferenz
Konferenz | Hydrovision 2019 |
---|---|
Kurztitel | Hydrovision |
Land/Gebiet | USA / Vereinigte Staaten |
Ort | Portland |
Zeitraum | 23/07/19 → 25/07/19 |
ASJC Scopus subject areas
- Allgemeine Energie
Fields of Expertise
- Sustainable Systems
Treatment code (Nähere Zuordnung)
- Application