Abstract
In this paper the work focuses on the transient behavior of combined 400 kV overhead and cable lines during switching processes and lightning impacts. A number of calculations were carried out to get an overview of the transient stress in numerous network nodes along the transmission system. Numerical programs like ATP/EMTP have been used for these simulations. Peak values and wave shapes of the transient voltage stress have been evaluated, based on different systems and within possible combinations. In respect of the insulation coordination and transient stress at network nodes, the voltage time trends are also analyzed.
The combination of high voltage overhead and cable transmission systems, especially such with lengths of more than about 50 km, are making tightened and extended demands to the network design, to the operational management and of course to the network protection also. As an output of this investigations, the results might influence the strategy in running this new type of combined transmission systems.
Originalsprache | englisch |
---|---|
Titel | 2008 International Conference on High Voltage Engineering and Application ICHVE |
Seiten | 71-75 |
Publikationsstatus | Veröffentlicht - 2008 |
Veranstaltung | 2008 International Conference on High Voltage Engineering and Application: ICHVE 2008 - Chongqing, China Dauer: 9 Nov. 2008 → 13 Nov. 2008 |
Konferenz
Konferenz | 2008 International Conference on High Voltage Engineering and Application |
---|---|
Kurztitel | ICHVE 2008 |
Land/Gebiet | China |
Ort | Chongqing |
Zeitraum | 9/11/08 → 13/11/08 |
Fingerprint
Untersuchen Sie die Forschungsthemen von „Aspects of High Voltage Cable Sections in Modern Overhead Line Transmission Systems“. Zusammen bilden sie einen einzigartigen Fingerprint.Projekte
- 2 Abgeschlossen
-
Hochspannungstechnik
Sumereder, C. (Teilnehmer (Co-Investigator)), Schwarz, R. (Teilnehmer (Co-Investigator)), Woschitz, R. (Teilnehmer (Co-Investigator)), Pack, S. (Teilnehmer (Co-Investigator)), Lick, W. (Teilnehmer (Co-Investigator)), Muhr, H. M. (Teilnehmer (Co-Investigator)), Eberhardt, R. (Teilnehmer (Co-Investigator)), Steyn, D. (Teilnehmer (Co-Investigator)), Judendorfer, T. (Teilnehmer (Co-Investigator)), Jaufer, S. (Teilnehmer (Co-Investigator)) & Fabian, J. (Teilnehmer (Co-Investigator))
1/01/95 → 31/12/24
Projekt: Forschungsprojekt
-
Isolationskoordination
Muhr, H. M. (Teilnehmer (Co-Investigator)) & Pack, S. (Teilnehmer (Co-Investigator))
1/01/95 → 31/12/24
Projekt: Arbeitsgebiet