Projekte pro Jahr
Abstract
In the engineering practice geotechnical engineers and geologists are faced with data
which due to their nature have a wide spread. Predictions derived from these data also contain
uncertainties. This paper proposes a procedure to facilitate the processing of these data, and to
consistently consider uncertain parameters in the rock mass characterisation process. For the
application of the procedure a computational model has been developed. It allows modelling the
geological architecture, assigning the rock mass parameters and evaluating the rock mass behaviour with different analytical calculation models. A case study from an alpine base tunnel demonstrates the procedure.
which due to their nature have a wide spread. Predictions derived from these data also contain
uncertainties. This paper proposes a procedure to facilitate the processing of these data, and to
consistently consider uncertain parameters in the rock mass characterisation process. For the
application of the procedure a computational model has been developed. It allows modelling the
geological architecture, assigning the rock mass parameters and evaluating the rock mass behaviour with different analytical calculation models. A case study from an alpine base tunnel demonstrates the procedure.
Originalsprache | englisch |
---|---|
Titel | Rock Engineering - Theory and Practice |
Erscheinungsort | Essen |
Herausgeber (Verlag) | VGE |
Seiten | 75-80 |
ISBN (Print) | 3-7739-5995-8 |
Publikationsstatus | Veröffentlicht - 2004 |
Veranstaltung | 2004 ISRM Regional Symposium Eurock: EUROCK 2004 - Salzburg, Österreich Dauer: 7 Okt. 2004 → 9 Okt. 2004 |
Konferenz
Konferenz | 2004 ISRM Regional Symposium Eurock |
---|---|
Kurztitel | EUROCK 2004 |
Land/Gebiet | Österreich |
Ort | Salzburg |
Zeitraum | 7/10/04 → 9/10/04 |
Anderes |
Fingerprint
Untersuchen Sie die Forschungsthemen von „Determination of Rock Mass Behaviour Types - a Case Study“. Zusammen bilden sie einen einzigartigen Fingerprint.Projekte
- 1 Abgeschlossen
-
A Hierarchical Rock Mass Characterization for Tunnel Design & A Deterministic and Probabilistic Approach
Schubert, W. (Projektleiter (Principal Investigator)) & Goricki, A. (Teilnehmer (Co-Investigator))
1/01/00 → 1/01/10
Projekt: Forschungsprojekt