Abstract
The Koralm railway tunnel with a length of about 33 km and an overburden up to 1700 m is
planned in southern Austria. To select the most economic alignment, a geotechnical assessment of the entire route corridor with an area of about 150 km² was made. It will be shown how the geotechnical parameters concerning costs and time of the planned TBM-excavation were determined and calculated. The mean value and distribution were determined for each parameter allowing statistical methods to be implemented into the analysis. To handle the extensive amount of data the results were assigned to various “layers” and visualized with a Geographic Information System (GIS). Due to the structure of the data a rating can be made by connecting the assessment parameters and layers respectively. It is, for example, possible to achieve a cost based
assessment of the entire corridor by applying cost relevant weighting factors.
planned in southern Austria. To select the most economic alignment, a geotechnical assessment of the entire route corridor with an area of about 150 km² was made. It will be shown how the geotechnical parameters concerning costs and time of the planned TBM-excavation were determined and calculated. The mean value and distribution were determined for each parameter allowing statistical methods to be implemented into the analysis. To handle the extensive amount of data the results were assigned to various “layers” and visualized with a Geographic Information System (GIS). Due to the structure of the data a rating can be made by connecting the assessment parameters and layers respectively. It is, for example, possible to achieve a cost based
assessment of the entire corridor by applying cost relevant weighting factors.
Originalsprache | englisch |
---|---|
Titel | Rock Mechanics - A Challenge for Society |
Erscheinungsort | Lisse |
Herausgeber (Verlag) | A.A. Balkema |
Seiten | 77-82 |
ISBN (Print) | 90-2651-821-8 |
Publikationsstatus | Veröffentlicht - 2001 |
Veranstaltung | 2001 ISRM Regional Symposium Eurock - Rock mechanics: a Challenge for Society: EUROCK 2001 - Espoo, Finnland Dauer: 4 Juni 2001 → 7 Juni 2001 |
Konferenz
Konferenz | 2001 ISRM Regional Symposium Eurock - Rock mechanics: a Challenge for Society |
---|---|
Kurztitel | EUROCK 2001 |
Land/Gebiet | Finnland |
Ort | Espoo |
Zeitraum | 4/06/01 → 7/06/01 |
Fingerprint
Untersuchen Sie die Forschungsthemen von „Geotechnical Assesment of the Route Corridor for the Koralm Base Tunnel“. Zusammen bilden sie einen einzigartigen Fingerprint.Projekte
- 2 Abgeschlossen
-
A Hierarchical Rock Mass Characterization for Tunnel Design & A Deterministic and Probabilistic Approach
Schubert, W. (Projektleiter (Principal Investigator)) & Goricki, A. (Teilnehmer (Co-Investigator))
1/01/00 → 1/01/10
Projekt: Forschungsprojekt
-
Gebirgsmechanische Modellierung
Radoncic, N. (Teilnehmer (Co-Investigator)), Pilgerstorfer, T. (Teilnehmer (Co-Investigator)), Schubert, W. (Projektleiter (Principal Investigator)) & Seidl, C. (Teilnehmer (Co-Investigator))
1/12/92 → 31/12/23
Projekt: Forschungsprojekt