New evaluation Methods in Pipe Roof Supported Tunnels and its Influence on Design during Construction

Jakob Likar, Günther Volkmann, Edward Alan Button

Publikation: Beitrag in Buch/Bericht/KonferenzbandBeitrag in einem KonferenzbandBegutachtung

Abstract

Pipe roof support systems are becoming increasing popular as cost and installation
times have decreased with improved technology. The design of these systems is still based
primarily on experience and the system behavior is still not well understood. Horizontal chain
inclinometers were applied at a shallow tunnel in weak rock to provide a quasi real-time feedback
of the pipe roof performance aimed at optimizing the excavation and support process to minimize
surface displacements. The evaluation methods utilized, what they show, and how they were able
to contribute to the adaptive design process are briefly explained in the paper. This system shows
very promising results for monitoring and evaluating pipe roof supported tunnels.
Originalspracheenglisch
TitelRock Engineering: Theory and Practice
Untertitel proceedings of the ISRM regional symposium Eurock 2004 & 53rd geomechanics colloquy, October 7 - 9, 2004, Salzburg / Austria
Redakteure/-innenW. Schubert
ErscheinungsortEssen
Herausgeber (Verlag)VGE
Seiten277-282
ISBN (Print)3-7739-5995-8
PublikationsstatusVeröffentlicht - 2004
Veranstaltung2004 ISRM Regional Symposium Eurock: EUROCK 2004 - Salzburg, Österreich
Dauer: 7 Okt. 20049 Okt. 2004

Konferenz

Konferenz2004 ISRM Regional Symposium Eurock
KurztitelEUROCK 2004
Land/GebietÖsterreich
OrtSalzburg
Zeitraum7/10/049/10/04
Anderes

Fingerprint

Untersuchen Sie die Forschungsthemen von „New evaluation Methods in Pipe Roof Supported Tunnels and its Influence on Design during Construction“. Zusammen bilden sie einen einzigartigen Fingerprint.
  • Time Dependent Displacements in Tunnel Excavation

    Schubert, W. (Projektleiter (Principal Investigator))

    1/03/031/01/10

    Projekt: Forschungsprojekt

  • Beitrag zur Bemessung von Rohrschirmen

    Volkmann, G. (Teilnehmer (Co-Investigator)) & Schubert, W. (Projektleiter (Principal Investigator))

    1/01/0231/12/23

    Projekt: Forschungsprojekt

  • Vorhersage von Verschiebungen im Tunnelbau

    Radoncic, N. (Teilnehmer (Co-Investigator)), Pilgerstorfer, T. (Teilnehmer (Co-Investigator)), Seidl, C. (Teilnehmer (Co-Investigator)) & Schubert, W. (Projektleiter (Principal Investigator))

    1/12/9631/12/23

    Projekt: Forschungsprojekt

Dieses zitieren