Projects per year
- 400 - 450 out of 2,201 results
Search results
-
-
Axiom - Robotic charging for accessibility
Brunner, H. & Hirz, M.
1/05/22 → 29/02/24
Project: Research project
-
B01 - Combustion Concepts for Passenger Cars - Combustion concepts and Aftertreatment
Leopold, K., Hadl, K., Lukas, A., Pramhas, J. & Schutting, E.
1/01/08 → 30/06/10
Project: Research project
-
B02T01 - Combustion Concepts for Large Diesel Engines, Reduction of Emissions and Fuel Consumption/Improvement of Development Methodology
Taucher, G., Pemp, B., Gufler, M., Wimmer, A. & Engelmayer, M.
1/01/10 → 31/12/12
Project: Research project
-
B03/T02 - Multicomponent Diesel Combustion Modelling and Validation
Wimmer, A., Losonczi, B. & Pirker, G.
1/01/11 → 31/12/13
Project: Research project
-
B04_T03 - Thermal Management /Full Vehicle Model to predict Thermal-Management-Actions
Unterguggenberger, P., Wimmer, A., Salbrechter, S., Pirker, G. & Jauk, T.
1/07/10 → 30/06/12
Project: Research project
-
-
B1T1 - Combustion Concepts and Aftertreatment Systems; Best in Class Fuel Consumption
1/01/13 → 31/07/15
Project: Research project
-
B1T1 - LEC - Optimized Combustion with Wide Range Diesel Injector for Dual Fuel Operation
Wimmer, A. & Redtenbacher, C.
1/03/15 → 31/12/16
Project: Research project
-
B1T2 - Reduction of Emissions and Fuel Consumption in Multi-Application Diesel Engines for Industrial Vehicles
Taucher, G., Wimmer, A., Vystejn, J. & Engelmayer, M.
1/12/13 → 30/09/14
Project: Research project
-
B2B-Models for Delivery Projects in the After-Sales-Service Area of OEMs (dissertation)
1/11/00 → 31/01/03
Project: Research project
-
B2T1 - LEC - Diesel Ignited HPDI Concept
Redtenbacher, C. & Wimmer, A.
1/07/17 → 30/09/18
Project: Research project
-
B2T2-LEC_KA - B2T2 - Pre-Turbo Charger Catalyst (PTCC) for Gas and Dual Fuel Engines
1/05/15 → 31/10/17
Project: Research project
-
Bases for the Development of Nickelbase Flux-Cored Wires (MCL-J1)
Buchmayr, B. & Vallant, R.
1/01/99 → 1/01/03
Project: Research project
-
Basic patterns of the innovation process of hydraulic machinery
1/07/97 → 28/02/01
Project: Research project
-
BE2020_FlexiFuelConversion - Concpets for future fuel-flexible fixed-bed conversion technologies
1/04/19 → 31/03/23
Project: Research project
-
BE2020_Interaction - Interaction of Technologies and Systems
1/04/19 → 31/03/23
Project: Research project
-
Benchmark calculation of four CFD codes on the example of an axial pump
Sadnik, D. & Schaffler, G. H.
1/11/97 → 30/06/98
Project: Research project
-
Berechnung der Auswirkung von Verkehrsmaßnahmen auf die NOx-Emissionen in Österreich
1/11/06 → 31/08/07
Project: Research project
-
-
-
-
Best Practice Guide of Double Skin Facades
Heimrath, R., Mach, T. & Streicher, W.
1/01/05 → 31/12/08
Project: Research project
-
Best Practice Solutions regarding quality requirements for fusion welding of metallic materials based on ISO 3834 for welding companies (JOIN E.2)
Weinberger, T. & Enzinger, N.
9/10/07 → 31/12/09
Project: Research project
-
BEST-Speed-up - Speed-up algorithms for advanced siumlations
1/04/23 → 31/03/27
Project: Research project
-
BEVx-2T Funktion - Functional test on the suitability of 2-stroke combustion for alternative fuels in the car Hybrid
1/02/18 → 31/01/21
Project: Research project
-
-
BfS - Long-term atmospheric dispersion models in urban areas for exposure calculations in the vicinity of medical and industrial facilities.
1/01/24 → 31/03/26
Project: Research project
-
-
-
Biaxial force-measuring system in wheel loaders via new force transducers
Grünbaum, P.
1/01/95 → 30/04/95
Project: Research project
-
Bicar-Reaktor - Multiphase stationary CFD simulations
Hochenauer, C., Prieler, R. J. & Anca-Couce, A.
1/07/18 → 30/09/18
Project: Research project
-
BIC - Battery Innovation Center for production technology, quality control and industry 4.0
1/09/19 → 31/08/21
Project: Research project
-
-
-
Bild. v CO2-Blasen i Getränken - Study on beverage properties influences on the size of CO2 bubbles produced by degassing
Garcia-Libreros, T. & Brenn, G.
1/12/08 → 31/07/10
Project: Research project
-
-
Bio-AWP - Biomass-driven Ammonia / Water Absorption Heat Pump for Heating and Cooling
Heinz, A., Böck, M., Moser, H., Halozan, H. & Rieberer, R.
1/10/04 → 30/04/07
Project: Research project
-
BIO-CCHP - Advanced biomass CCHP based on gasification, SOFC and cooling machines
Scharler, R., Hochenauer, C., Anca-Couce, A., Subotić, V., Pongratz, G. & Wagner, P.
1/04/18 → 31/03/21
Project: Research project
-
BioCFD - Hackgut-/Holzpelletfeuerungen - CFD-gestützte Neukonstruktion und feuerungstechnische Optimierung
5/08/13 → 1/10/16
Project: Research project
-
BioControl4Power - Optimal operation of biogas plants and biomass CHP at the interface between electricity markets and heat consumers
Hochenauer, C., Mach, T., Heimrath, R., Heinz, A. & Edtmayer, H.
1/01/22 → 30/06/24
Project: Research project
-
Biodiesel and Other Alternative Fuels for Use in Engines (Continuation in section: Emission)
Blassnegger, J. & Engler, D.
1/01/94 → 31/01/05
Project: Research area
-
BioFacLay - BF: Bio-inspired Factory Layouts for optimal Materialflow
1/03/16 → 28/02/19
Project: Research project
-
BioFire NextGen - Entwicklung einer Biomasse-Kleinfeuerungsanlage der nächsten Generation
3/02/14 → 31/01/17
Project: Research project
-
Biogas CHP and District Heating on the Basis of Biomass
Pogoreutz, M.
1/12/98 → 31/03/99
Project: Research project
-
Bio-LOOP - Chemical Looping for efficient biomass utilisation
Hacker, V., Hochenauer, C., Scharler, R., Anca-Couce, A., Blaschke, F., Stoppacher, B., Bock, S., Pauritsch, M., Lammer, M., Pongratz, G., Von Berg, L. & Malli, K.
1/04/20 → 31/03/24
Project: Research project
-
-
Biomass Gasification CHP - Novel Concept
Haselbacher, P. & Lettner, F.
1/01/03 → 31/12/05
Project: Research project
-
Biomass Gasification - Health, Safety, Environment
Timmerer, H. L. & Lettner, F.
1/03/03 → 31/12/05
Project: Research project