Projects per year
- 1,550 - 1,600 out of 2,223 results
Search results
-
Research project
Development of a Test Method to Optimize the Spray Distribution of Fans for Fruit Plantations
Meinhart, J.
1/02/97 → 31/12/98
Project: Research project
-
Extreme applications for conventional wet runner pumps
Penninger, G. & Meusburger, P.
1/01/02 → 31/01/02
Project: Research project
-
-
-
Numericla Design of Impellers, Volutes and Double Volutes for Pumps of Different Specific Speeds
1/01/03 → 31/01/06
Project: Research project
-
23_IND_ENTRANT - Methodsdevelopment analysis/simulation of airbag deployment
1/04/23 → 30/11/23
Project: Research project
-
Experimental and numerical investigation on the damping of pressure pulsations by a branch resonator
Logar, R. & Krisper, A.
5/01/95 → 31/05/95
Project: Research project
-
21_IND_BP_LoadBatQS - Mechanical characterization tests of charged Batterie-cellconcepts with quasistatic loads
1/07/21 → 31/07/21
Project: Research project
-
EU - Support HDV CO2 - Technical Support for the Delvelopment of HDV Certification
6/03/19 → 5/11/20
Project: Research project
-
-
Vertical Wind Tunnel - a feasibility study
Brenn, G. & Meile, W.
1/10/02 → 5/02/03
Project: Research project
-
Friction Analysis of a 4-Stroke 75 ccm Engine Air-Cooled in Strip-Down
Schaffer, K. M. & Kirchberger, R.
1/02/01 → 30/06/01
Project: Research project
-
SZF2 - Analysis of chain-wheel-contact for apron conveyors
1/07/18 → 30/06/19
Project: Research project
-
CD-Laboratory for Computermodellierung werkstoffkundlicher Vorgänge und Verarbeitungstechnolgien
Buchmayr, B.
1/07/91 → 30/06/98
Project: Research project
-
Technological study of decentralized power production and correlating business models
23/01/12 → 31/12/14
Project: Research project
-
Optimization of an Aerostatic Slide Bearing for an Rotational Rheometer
Draxl, H. & Hochleitner, H.
1/01/98 → 31/07/15
Project: Research project
-
-
CDL Thd-VKM: Development of an Engine Model for Simulating Transient Driving Performance and Exhaust Emissions.
Samhaber, C. & Wimmer, A.
1/12/98 → 31/12/00
Project: Research project
-
A Streamline Curvature Method to Optimize the Hydraulics of Francis Runners
Kniely, W.
1/01/95 → 31/01/02
Project: Research project
-
-
Verfügbarkeit - Facility-availability of an intralogistics-system
Jodin, D.
1/05/14 → 30/03/15
Project: Research project
-
-
Knowledge Oriented Design of Value Adding Networks (Doctoral Thesis)
Ritsch, K.
1/10/01 → 31/01/03
Project: Research project
-
Verteileranlage - Comparison of bids of three sorting system for a new parcel center
Jodin, D.
1/08/16 → 31/10/16
Project: Research project
-
-
-
EAGLE - EAGLE -Development of automated parcel unloading device
1/07/15 → 31/12/16
Project: Research project
-
-
PoNG - Potentialanalyse einer neuen Schlittenanlage
Woitsch, G.
1/09/11 → 29/02/12
Project: Research project
-
-
Dissimilar Metal Joining by the Use of Graded Compositions
Cerjak, H. & Buchmayr, B.
1/09/91 → 31/01/95
Project: Research project
-
Development of optical techniques for flow testing in turbomachinery
1/01/04 → 31/12/05
Project: Research project
-
Software Development for Design of an Air Cooling Cycle of a Wind Power Generator
Gehrer, A. A.
26/06/00 → 31/07/00
Project: Research project
-
Process Management and Controlling-related Aspects of Process Management
1/02/93 → 31/03/97
Project: Research project
-
-
Extensive customer- and process-orientation
Schimanofsky, W.
1/09/95 → 31/03/98
Project: Research project
-
-
CD-Laboratory for Continuous Solidification Processes, Module: Separation of solid particles in turbulent slit flows
Ranegger, G. & Schaflinger, U.
1/10/97 → 30/11/01
Project: Research project
-
Use of Optical Measurement Technologies in the Integrated Combustion Diagnostics
Jauk, T. & Wimmer, A.
1/01/01 → 30/09/03
Project: Research project
-
-
Development of modular expandable technical solutions, that allow the heat distribution of new building areas with solar asssted district heating networks
Heimrath, R., Puschnig, P. & Streicher, W.
1/11/04 → 28/02/07
Project: Research project
-
Comparison of measured and with FEM calculated residual stresses due to welding of austenitic stainless hoop welds
1/06/95 → 31/12/95
Project: Research project
-
Hydrovation - Qualifizierungsnetzwerke
Stöfan, G., Sommitsch, C., Vallant, R. & Enzinger, N.
1/01/17 → 31/12/18
Project: Research project
-
18_IND_Similar_P01 - Adaptation of the SimbaV method to determine the thoraxkinematics with additional dummymodels
1/02/18 → 31/03/18
Project: Research project
-
Verfügbarkeitsanalyse 12 - Facility-availability of an intralogistics-system
1/07/21 → 31/07/22
Project: Research project
-
-
-
-
Verfügbarkeitsanalyse 8 (ShopApo) - Facility-availability of an intralogistics-system (Shop Apo)
1/08/20 → 31/12/20
Project: Research project