Projects per year
- 1 - 50 out of 98 results
Search results
-
3D-Gebäudemodelle - Realistic Consideration of structural behaviour with 3D-Modelling
1/09/17 → 31/08/20
Project: Research project
-
Accompanying study about the development of a supplementary reinforced concrete part for a new brick ceiling system
Schlöglmann, K. H.
23/04/08 → 12/09/08
Project: Research project
-
AIMons - Measuring of crack width in reinforced concrete stucutures by the use of fibre optic sensors
14/03/24 → 1/09/24
Project: Research project
-
-
-
AVI-TK Dehnfugenabstand - Small-scale tests on combined cyclic and static loading of the AVI-TK
Gheorghiu, D.
12/01/23 → 31/03/23
Project: Research project
-
-
Bauteile aus UHPC - Development of design rules for components made of UHPC
1/09/13 → 30/10/16
Project: Research project
-
BBT - Massige Bauteile - Munich-Verona railroad axis, Brenner base tunnel, verification of the quality assurance of massive components
27/05/22 → 31/12/22
Project: Research project
-
Bearing Capacity of Retrofitted Bridge Decks
Fülöp, U., Linder, J., Freytag, B., Hartl, H. & Kernbichler, K.
1/06/01 → 31/01/02
Project: Research project
-
Behavior of Shear Forces between Prefabricated Concrete Elements and In Situ Concrete
1/01/95 → 31/01/00
Project: Research project
-
-
Botlek Bridge - Minimum reinforcement for the foundation piers of the new Botlek Bridge in Rotterdam; NL
1/01/13 → 1/02/13
Project: Research project
-
COEBRO - Additive Fabrication of Concrete Elements by Robots
Freytag, B., Nguyen, V. T., Peters, S., Hansemann, G., Schmid, R., Pirker, E. M., Pichlkastner, C., Sliskovic, V., Tapley, J. P., Kim, H. H., Holzinger, C., Trummer, A. & Schraml, D.
1/09/15 → 31/01/19
Project: Research project
-
-
Cooperation to Activities of Section "Prestressed Concret" of Österr. Betonverein
1/01/99 → 31/01/09
Project: Research project
-
-
CPC Zulassung - CPC declaration of approval for new concrete
20/05/22 → 31/12/22
Project: Research project
-
-
Development of Truss Structure with High Performance Concrete and Alternative Reinforcement
Stebernjak, B. & Kernbichler, K.
1/08/02 → 31/01/04
Project: Research project
-
Druckglieder aus UHPC - UHPC Column
Nguyen, V. T., Sparowitz, L., Fink, E., Linder, J., Heinzle, G., Illich, G. W. & Freytag, B.
1/03/10 → 28/02/13
Project: Research project
-
DW2 - Thermally improved diaphragm walls
Nguyen, V. T., Passer, A., Rebhan, M. & Schlicke, D.
3/08/20 → 30/04/22
Project: Research project
-
Earthquake Behavior of Bridges Connected Rigidly to Piers
Sparowitz, L. & Flesch, R.
1/10/98 → 31/01/10
Project: Research project
-
Einflussfaktoren-Stahlbetonbauteile - Calculation and studies of factors influencing reinforced concrete components
1/10/23 → 30/09/24
Project: Research project
-
-
Engineering Design Science
Freytag, B., Schanz, M., Gamerith, H., Beer, G., Vabitsch, G., Schickhofer, G., Lechner, H., Sparowitz, L., Maydl, P., Greiner, R. & Walder, U.
1/01/05 → 31/12/09
Project: Research project
-
Experimental Research on structural concrete
Fülöp, U., Sparowitz, L., Linder, J. & Freytag, B.
1/10/04 → 31/01/13
Project: Research area
-
Faserbetontübbinge - Formation of a basis for the use of fibre-reinforced concrete segments in Austria
1/04/21 → 31/03/24
Project: Research project
-
-
-
FrankfurtFour - Building Project "New building 60547 FOUR"
1/08/21 → 31/12/21
Project: Research project
-
FWF - Beulen Scheiben UHPFRC - Shear Carrying Capacity and Buckling of UHPFRC Panels
Escobar Castillo, M. N., Linder, J., Heidrich, J., Freytag, B., Heinzle, G. & Sparowitz, L.
1/02/06 → 30/09/10
Project: Research project
-
FWF - Mindestbewehrung - Material Law and Model to Estimate Minimum Reinforcement
1/06/12 → 30/09/15
Project: Research project
-
FWF - Querkraft - Systematic study on the shear behavior of RC members
1/10/19 → 30/09/22
Project: Research project
-
GaSIm - Ground and Soil Improvement Modelling
Schlicke, D., Unterlaß, P. J., Rebhan, M. & Leo, J.
1/11/23 → 31/10/24
Project: Research project
-
Glass-Concrete-Composite Constructions
Freytag, B., Sparowitz, L., Santner, G., Kernbichler, K. & Linder, J.
1/10/98 → 31/01/15
Project: Research area
-
Göltzschtalbrücke - BAB A 72 Preservation measure D46RL
Freytag, B., Nguyen, V. T. & Schlicke, D.
1/08/21 → 30/09/22
Project: Research project
-
Hybrid-Mast - Design concept for tall transmission towers in concrete-steel-hybrid construction
1/03/18 → 31/12/18
Project: Research project
-
Increase of load bearing capacity of reinforced concrete structures with adhesive CFP-lamellas
1/11/96 → 31/01/97
Project: Research project
-
Ingenieursmodell Schub - engineering model for torsional loads
1/07/13 → 30/06/15
Project: Research project
-
-
Innovative Construction with Concrete
Sparowitz, L., Stebernjak, B. & Freytag, B.
1/01/98 → 31/01/15
Project: Research area
-
-
-
-
-
KWT - Behaviour of fibre reinforced elements using kwt-steel fibres
13/11/20 → 31/03/21
Project: Research project
-
Lange integrale Brücken - Long integral bridges - [Original in Deutsch: Integralbrücken über 70 m Länge]
1/07/13 → 30/06/15
Project: Research project
-