Projects per year
Search results
-
Active
WHB - Tests for the determination of mechanical strength and stiffness parameters
1/12/23 → 31/12/24
Project: Research project
-
rethink_LTprocessing - Process combination of peeling and sawing of large diameter roundwood: Peeled Boards for yield-optimized timber construction products
1/10/23 → 30/09/26
Project: Research project
-
-
-
HOT - Holz-on-Top - Urban redensification with modular timber structures, Compaction of roof spaces of old buildings by means of modularised timber construction
1/09/22 → 31/08/24
Project: Research project
-
Green_Gantry - Innovative wood solutions for stationary toll systems (gantries)
1/06/22 → 31/05/25
Project: Research project
-
CLT_Plumbing_Design - Computer-aided planning process for the automated design of bathrooms for timber construction
Schickhofer, G., Monsberger, M. & Fortmüller, P.
1/06/21 → 31/05/24
Project: Research project
-
Experimental Research on Timber Structures
Freytag, B., Schickhofer, G. & Trummer, A.
1/10/04 → 14/05/29
Project: Research area