Projects per year
Search results
-
Finished
Investigations in vehicle behavior on local networks
Jörg, A. & Rießberger, K.
1/01/06 → 31/01/06
Project: Research project
-
RoLa - Verwindeversuche
Narbeshuber, T., Hummitzsch, R. & Rießberger, K.
1/11/05 → 28/02/06
Project: Research project
-
Consultiong for upgrading the Austrian railway net
Jörg, A. & Rießberger, K.
1/01/05 → 31/01/09
Project: Research project
-
LUAS - LRT Dublin
Jörg, A., Tritthart, J. & Rießberger, K.
1/01/05 → 31/01/07
Project: Research project
-
-
Siemens - Projekt FXM - Quality Increase Program
Veit, P., Marschnig, S., Rießberger, K., Bauer, U. & Affenzeller, P.
1/03/03 → 21/07/08
Project: Research project
-
RS - REWI - Development of Switch Innovation
Rießberger, K. & Fischer, J.
1/03/03 → 31/01/06
Project: Research project
-
EU - R.O.S.E - Optimization of Track Behavior Concerning Noise and Vibration
Rießberger, K. & Fischer, J.
1/03/03 → 31/01/06
Project: Research project
-
-
-
-
-
RoLa - Rotation of Bogies/Experimental Station Knittelfeld
Rießberger, K. & Vankat, H.
1/01/02 → 31/01/04
Project: Research project
-
RoLa - Practicability of Modification Concerning the SGP-RoLA-Vehicle
1/01/02 → 31/01/04
Project: Research project
-
-
-
Analysis of car-track interaction on the railway of VA Stahl Donawitz Ges.m.b.H.
Rießberger, K. & Greiner, S.
1/12/97 → 28/02/98
Project: Research project
-
-
Proof of a minimum duration of life (30 years) of curved switch-blades (ST-UIC 54-190-1:7,5) under the operational conditions of the Metro-Line Copenhagen
Pesec, W. & Rießberger, K.
1/10/97 → 31/10/97
Project: Research project
-
Analysis of the instable running behaviour of freight cars
Rießberger, K. & Greiner, S.
1/01/97 → 31/01/00
Project: Research project
-
Track Geometry and Cost-Efficiency - or - How Good must the Track be?
1/01/97 → 30/09/98
Project: Research area
-
-
Coordination and scientific guidance of the tramway project south-west-lines of Graz
Pesec, W., Veit, P. & Rießberger, K.
1/01/96 → 31/01/97
Project: Research project
-
Analysis of local requirements of Graz mainstation with regard to the south-east-line
1/01/95 → 31/01/95
Project: Research project
-
UNRA-running tests for proofing the out of roundness, degree of hardness and profile of ÖBB-through-passenger stock-wheels in a new and worn out condition
Rießberger, K. & Fischer, J.
1/01/95 → 31/01/99
Project: Research project
-
Measuring of the friction-coefficient in ÖBB-tracks
Wiesberger, M., Rießberger, K. & Fischer, J.
1/01/95 → 31/01/98
Project: Research project
-
Running tests against buffer-stops (Vienna Underground Railway)
Fischer, J. & Rießberger, K.
1/01/95 → 31/01/98
Project: Research project
-
Railway Link Argentina - Chili, Technical and Operational Considerations, Anden-Tunnel-Project.
1/01/95 → 31/01/95
Project: Research project
-
Tests of new prestressed concrete-ties to proof the safety against derailment
Fischer, J. & Rießberger, K.
1/01/95 → 31/01/98
Project: Research project
-
Operational Considerations for the railwaystation Messendorf
1/01/95 → 31/01/96
Project: Research project
-
Actualization of the styrian traffic plan
Veit, P., Rießberger, K. & Pesec, W.
1/01/95 → 31/01/97
Project: Research project
-
Studies on the corridors of the Koralm-link
Rießberger, K., Veit, P. & Pesec, W.
1/01/91 → 31/03/98
Project: Research project