A26 - Phase 02 - Carrying out soil mechanics laboratory tests to determine the swelling behaviour - Laboratory Tests - Drilling Phase 5a
1/01/22 → 31/12/22
Project: Research project
-
Lab-RMT-IAG-Angerberg - Laboratory tests (rock mechanical, mineralogical): Angerberg, cavern drillings
1/01/21 → 1/09/21
Project: Research project
-
Lab-RMT-IAG_Köstendorf-Salzburg - Laboratory tests (rock mechanical, mineralogical): new railway line Köstendorf-Salzburg
1/10/20 → 31/12/22
Project: Research project
-
Lab-RMT-Rock bolt p.o.r. - Laboratory tests (rock mechanical): Rock bolt pull out tests resin
1/07/20 → 30/11/20
Project: Research project
-
KW Obervellach II - Laboratory test program rock mechanics for exploration program II
Marte, R., Latal, C. & Blümel, M.
31/08/18 → 31/12/19
Project: Research project
-
Mönchsberggarage - Expension Mönchsberggarage laboratory tests
27/09/13 → 30/04/14
Project: Research project
-
Stability prediction for slopes and hillsides
Semprich, S., Schubert, W., Steger, G., Scharinger, F., Leibniz, O., Grossauer, K., Leitner, R., Lenzi, M. & Blümel, M.
1/02/06 → 30/11/06
Project: Research project