Projects per year
Search results
-
Finished
OPEDTS2 - Optimization of Dedicated Hybrid Transmission Systems - Two-Speed Electric Powertrain Path
1/04/22 → 28/02/23
Project: Research project
-
OPEDTS1 - Optimization of Dedicated Hybrid Transmission Systems - Stage #1 - Electric Powertrain Path
1/07/21 → 28/02/22
Project: Research project
-
OPIP - Simulation and optimization methods for electrical machines
1/01/20 → 31/12/21
Project: Research project