Project Details
Description
For the construction of the Silltal approach section to the Brenner Base Tunnel, massive concrete members are to be produced. General temperature limits for the hardening-related heating were specified in the construction contract, which cannot be realised technically. In the course of the project, project-specific temperature limits will be determined that can be implemented on the construction site without contradicting the desired quality.
Status | Finished |
---|---|
Effective start/end date | 27/05/22 → 31/12/22 |