Project Details
Description
Optimization of an existing wastewater concept:
In a preliminary study, the on-line monitoring capabilities for detection and monitoring of micro plastic loads are checked and tested at varying runoff conditions. Besides the basic data for the setup of a hydrodynamic simulation model of the entire pure-water-drainage system is explored. In a second step the on-line monitoring concept should be implemented and operated at least until the end of Q3/2015 and scientifically supervised and accompanied.
Status | Finished |
---|---|
Effective start/end date | 1/09/14 → 28/02/15 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.