CLEARWATER-2015 - Wastewater Concept Borealis - Main Project

Project: Research project

Project Details

Description

Optimization of an Existing Industrial Drainage System: Based on the results of a preliminary study an online monitoring network will be installed, operated, scientifically supervised and accompanied for the detection and monitoring of drained micro plastic loads. Besides a hydrodynamic simulation model of the entire pure-water-drainage system will be built up and calibrated and validated. Both systems serve for the optimization of an existing industrial drainage system to reduce the emitted micro plastic loads into the receiving water.
StatusFinished
Effective start/end date1/06/1529/02/16

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.