As part of this project, extended investigations are being carried out on the modified Denil Pass. These measurements and evaluations are carried out on the one hand in the hydraulic engineering laboratory and on the other hand at the fish pass at Friesach power plant.
Status | Finished |
---|---|
Effective start/end date | 1/07/22 → 31/07/23 |