Project Details
Description
- design of railway bridges, including high speed traffic (160 km/h)
- check of calculations, design drawings
- development of structural details and joints
Status | Finished |
---|---|
Effective start/end date | 1/09/14 → 30/11/14 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.