Design of temporary steel railway bridges - HHB 291, HHB 239, HHB 213

Project: Research project

Project Details

Description

- design of railway bridges, including high speed traffic (160 km/h) - check of calculations, design drawings - development of structural details and joints
StatusFinished
Effective start/end date1/09/1430/11/14

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.