Project Details
Description
Subsoil improvement measures are required as an alternative to classic deep foundation measures if no sufficiently load-bearing subsoil is available during the construction of structures for the safe and low-settlement transfer of the structure loads.
Status | Finished |
---|---|
Effective start/end date | 1/06/21 → 31/05/22 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.