Project Details
Description
Order for the scientific support of constructional use of CO2-reduced concrete is based on the knowledges of ERESCON. The task is to verify Eco-filler/Micro-filler concept at an prototypical building (Durchlassbauwerk), which was built during the construction of the Prottendorfer railway line.
Status | Finished |
---|---|
Effective start/end date | 1/02/17 → 31/03/22 |