Project Details
Description
Economic evaluation – flood control measures
Description: The economic analysis compares the costs of different options for the protection of the technical installations of railway lines with the alternatively arising, monetarily assessed technical damage and consequential costs of cancelled, re-routed and/or delayed trains.
Status | Finished |
---|---|
Effective start/end date | 1/10/16 → 31/12/16 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.