Project Details

Description

The company Kendrion (Eibiswald) GmbH develops and produces high-class and innovative electromagnetic components and systems for the automotive industry. Because of a new major order, achieved by Kendrion, new production systems in the plant location Eibiswald become necessary. In the course of the project a catalog of requirements shall be worked out. Based on this the material flow and the factory design shall be planned and the ideal order sizes and cycles shall be determined. Therefore several layout variants are worked out and evaluated in a simulation program.
StatusFinished
Effective start/end date21/05/1422/12/14

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.