Project Details
Description
Within the scope of this project, two variants (‘standard’ = expansion without transmission and ‘co-managed’ = expansion including transmission) for a possible expansion of transmission capacities in Carinthia's electricity grid are implemented in the optimisation model that has already been created. Selected scenarios from the preliminary project are subsequently solved for both variants and the results obtained are analysed comparatively.
Status | Finished |
---|---|
Effective start/end date | 15/02/25 → 31/03/25 |