Project Details
Description
On the steel penstock during revision an unscheduled kink of the pipe was noticed, leading to a plastification of the steel pipe. Numerical calculation, with simulation of the pipe kink, showed sufficient ultimate load capacity, for both external and internal pressure.
Status | Finished |
---|---|
Effective start/end date | 1/12/20 → 7/12/20 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.