Rotes Tor - Model test of the Rotes Tor power plant

Project: Research project

Project Details

Description

As part of the planned reconstruction of the existing small hydropower plant "Rotes Tor" on the Frutz, the weir system with the subsequent desander is to be renewed in such a way that the existing water intake, which is currently designed for a water volume of 2.15 m³/s, can draw in 5m³/s in the future. The Frutz has a very dynamic flow behaviour in this section of the watercourse and the amount of bedload is considerable.
StatusActive
Effective start/end date15/02/2331/12/24

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.