Project Details
Description
Within the scope of the project, the two wastewater treatment plants for the purification of tunnel wastewater during the construction of the Semmering Base Tunnel in the SBT1.1 construction section are being scientifically investigated and their functionality and design examined.
Status | Finished |
---|---|
Effective start/end date | 15/01/20 → 31/12/20 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.