Project Details
Description
The project relates to the "Passenger Car Production Area (RZW) 1" operated at the Simmering site. The scheduled revision of international passenger coaches. Furthermore, modifications and improvements are made to the rail vehicles and smaller so-called "demand repairs" are carried out.
In a project, the "Takt-Kompakt" concept developed in the RZW1 area is to be externally reviewed with the help of a simulation. The focus will be on analyzing the effectiveness of the defined measures with regard to stable fulfillment of the lead times agreed. If necessary, further measures are to be defined in the project to ensure the stability of the maintenance process and to identify existing optimization potential. In addition, the responsible persons are to be trained in the field of "Lean Production".
Status | Finished |
---|---|
Effective start/end date | 10/01/23 → 31/03/23 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.