Dust loads in railway tunnels –results from in-situ measurements and consequences for tunnel facilities and railway operation

Research output: Contribution to conferencePaperpeer-review

Abstract

Extended measurements were carried out by IVT during an ÖBB pilot project. These measurements include the observation of dust loads within a railway tunnel over a period of about two years. The analysation finally led to PM emission factors for various train types under consideration of certain parameters such as the train speed, train specific parameters, precipitation, etc.
Original languageEnglish
Publication statusPublished - 2 Dec 2020
Event10th International Conference Tunnel Safety and Ventilation - Graz , Virtuell, Austria
Duration: 1 Dec 20203 Dec 2020

Conference

Conference10th International Conference Tunnel Safety and Ventilation
Country/TerritoryAustria
CityVirtuell
Period1/12/203/12/20

Fingerprint

Dive into the research topics of 'Dust loads in railway tunnels –results from in-situ measurements and consequences for tunnel facilities and railway operation'. Together they form a unique fingerprint.

Cite this