Abstract

The 880 MW pumped storage hydro power plant Gouvães, part of the Alto Tâmega hydro power scheme from Iberdrola is currently under construction in the north of Portugal. The energy storage and grid regulating plant is equipped with 4 reversible Francis pump turbines with nominal power of 220 MW and a gross head of 660 m, the discharge in turbine mode is 160 m³/s and in pumping mode 128 m³/s. The current paper underlines the layout, the design criteria and the results of the physical small-scale test of the tail race surge tank in the hydraulic laboratory. Most unfavourable load cases were studied such as synchronous pump trip in resonance and multiple loading and unloading followed by full load rejection in generating mode. A collaborated transient investigation for water hammer and mass oscillation capturing was conducted and gives cross checking opportunity.
Original languageEnglish
Title of host publication20th International Seminar on Hydropower Plant
EditorsEduard Doujak, Christian Bauer
Pages841-850
Publication statusPublished - 2018
Event20th International Seminar on Hydropower Plants - , Austria
Duration: 14 Nov 201816 Nov 2018
https://www.viennahydro.com/

Conference

Conference20th International Seminar on Hydropower Plants
Abbreviated titleViennahydro
Country/TerritoryAustria
Period14/11/1816/11/18
Internet address

Keywords

  • Surge Tank
  • Transient Hydraulics
  • Physical model test
  • Pumped Storage Hydropower
  • Flexible Hydropower

Fingerprint

Dive into the research topics of 'HYDRAULICS OF THE TAIL RACE SURGE TANK OF GOUVÃES PUMPED-STORAGE HYDROPOWER'. Together they form a unique fingerprint.