Projects per year
Abstract
The model represents the university building Inffeldgasse 13, PZ02.
PZ02 is part of the “Produktionstechnikzentrum”, a complex consisting of several buildings, used as laboratories and administrative purposes of the TU Graz. The ground floor facilitates lecture halls and seminar rooms, the upper floors laboratories, administration offices, seminar rooms and more. A data centre, which serves the entire Inffeldgasse-Campus at the TU Graz, is in the basement. The whole facility is heated and cooled by geothermal energy.
project name: PZ02 (Produktionstechnikzentrum 2)
operator: TU Graz (Technische Universität Graz)
project adress: Inffeldgasse 13 8010 Graz Austria
architecture: Hans Mesnaritsch
client: BIG (Bundesimmobiliengesellschaft)
type of use: production technology centre
building type: new construction
storeys: 9
net floor area: 7199 m²
PZ02 is part of the “Produktionstechnikzentrum”, a complex consisting of several buildings, used as laboratories and administrative purposes of the TU Graz. The ground floor facilitates lecture halls and seminar rooms, the upper floors laboratories, administration offices, seminar rooms and more. A data centre, which serves the entire Inffeldgasse-Campus at the TU Graz, is in the basement. The whole facility is heated and cooled by geothermal energy.
project name: PZ02 (Produktionstechnikzentrum 2)
operator: TU Graz (Technische Universität Graz)
project adress: Inffeldgasse 13 8010 Graz Austria
architecture: Hans Mesnaritsch
client: BIG (Bundesimmobiliengesellschaft)
type of use: production technology centre
building type: new construction
storeys: 9
net floor area: 7199 m²
Original language | English |
---|---|
Publication status | Published - 13 May 2021 |
Keywords
- BIM
- Sustainable Buildings
Fields of Expertise
- Sustainable Systems
Fingerprint
Dive into the research topics of 'Inffeldgasse 13, PZ02 (Produktionstechnikzentrum 2), BIM Model'. Together they form a unique fingerprint.Projects
- 2 Finished
-
ParisBuildings - Transition of the procurement process towards Paris compatible public buildings
Getzinger, G. (Co-Investigator (CoI)), Passer, A. (Co-Investigator (CoI)), Scherz, M. (Co-Investigator (CoI)), Kreiner, H. (Co-Investigator (CoI)) & Truger, B. (Co-Investigator (CoI))
1/12/19 → 30/06/23
Project: Research project
-
IEA EBC Annex 72 - EBC Annex 72 Assessing Life Cycle Related Environmental Impacts Caused by Buildings
Röck, M. (Co-Investigator (CoI)), Passer, A. (Co-Investigator (CoI)), Reisinger, T. (Co-Investigator (CoI)) & Ruschi Mendes Saade, M. (Co-Investigator (CoI))
1/11/17 → 30/06/23
Project: Research project