New evaluation Methods in Pipe Roof Supported Tunnels and its Influence on Design during Construction

Jakob Likar, Günther Volkmann, Edward Alan Button

Research output: Chapter in Book/Report/Conference proceedingConference paperpeer-review

Search results

  • Finished

    Time Dependent Displacements in Tunnel Excavation

    Schubert, W. (Principal Investigator (PI))

    1/03/031/01/10

    Project: Research project

  • Design of Pipe Roof Support System

    Volkmann, G. (Co-Investigator (CoI)) & Schubert, W. (Principal Investigator (PI))

    1/01/0231/12/23

    Project: Research project

  • Prediction of Displacements in Tunnelling

    Radoncic, N. (Co-Investigator (CoI)), Pilgerstorfer, T. (Co-Investigator (CoI)), Seidl, C. (Co-Investigator (CoI)) & Schubert, W. (Principal Investigator (PI))

    1/12/9631/12/23

    Project: Research project

  • Tunnelling in poor and faulted Rock Mass

    Volkmann, G. (Co-Investigator (CoI)), Lee, Y.-Z. (Co-Investigator (CoI)) & Schubert, W. (Co-Investigator (CoI))

    1/10/9231/12/24

    Project: Research area