Self-Unit Commitment of Combined-Cycle Units with Real Operational Constraints

Mauro González-Sierra*, Sonja Wogrin

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

This paper highlights the importance of accurately modeling the operational constraints of Combined-Cycle Gas Turbines (CCGTs) within a unit-commitment framework. In practice, in Colombia, when given an initial dispatch by the Independent System Operator, CCGT plants are operated according to the results of heuristic simulation codes. Such heuristics often omit technical operating constraints, including hot, warm, or cold startup ramps; the minimum operation hours required for a gas turbine to start a steam turbine; the relationship between the dispatched number of steam and gas turbines; the load distribution among gas turbines; and supplementary fires. Most unit-commitment models in the literature represent standard technical constraints like startup, shutdown, up/down ramps, and in some cases, supplementary fires. However, they typically overlook other real-life CCGT operating constraints, which were considered in this work. These constraints are crucial in integrated energy systems to avoid equipment damage, which can potentially put CCGT plants out of service and ultimately lead to lower operating costs.

Original languageEnglish
Article number51
JournalEnergies
Volume17
Issue number1
DOIs
Publication statusPublished - Jan 2024

Keywords

  • Combined-Cycle Gas Units (CCGs)
  • startup ramps
  • steam turbines
  • unit commitment

ASJC Scopus subject areas

  • Renewable Energy, Sustainability and the Environment
  • Fuel Technology
  • Engineering (miscellaneous)
  • Energy Engineering and Power Technology
  • Energy (miscellaneous)
  • Control and Optimization
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Self-Unit Commitment of Combined-Cycle Units with Real Operational Constraints'. Together they form a unique fingerprint.

Cite this