Projects per year
Projects
- 4 Finished
Search results
-
A Hierarchical Rock Mass Characterization for Tunnel Design & A Deterministic and Probabilistic Approach
Schubert, W. & Goricki, A.
1/01/00 → 1/01/10
Project: Research project
-
Modelling of Rock Mass Behaviour
Radoncic, N., Pilgerstorfer, T., Schubert, W. & Seidl, C.
1/12/92 → 31/12/23
Project: Research project
-
Rock Mass Characterization of Phyllites for Tunneling
Schubert, W. & Riedmüller, G.
1/01/96 → 31/01/97
Project: Research project
-
Rock Mass Characterization of Phyllites for Tunnelling (II)
Button, E. A., Schubert, W. & Riedmüller, G.
1/01/01 → 31/12/03
Project: Research project