Data completion in building information management: electrical lines from range scans and photographs

Ulrich Krispel, Henrik Leander Evers, Martin Tamke, Torsten Ullrich

Publikation: Beitrag in einer FachzeitschriftArtikelBegutachtung

Abstract


Background

The concept of building information management (BIM) is based on its holistic nature. This idea pays off, if all relevant information is fused into one consistent data set. As a consequence, the completeness of data is vital and the research question on how to complete data automatically remains open.
Methods

In this article we present a data completion technique based on knowledge management. We encode expert and domain knowledge in a generative system that represents norms and standards in a machine-readable manner. The implementation of this approach be used to automatically determine a hypothesis on the location of electrical lines within indoor range scans.
Results

The generative paradigm can encode domain expert knowledge in a machine-readable way. In this article we demonstrate its usage to represent norms and standards.
Conclusions

The benefit of our method is the further completion of digital building information models – a necessary step to take full advantage of building information modeling.
Originalspracheenglisch
Seitenumfang11
FachzeitschriftVisualization in Engineering
Jahrgang5
Ausgabenummer1
DOIs
PublikationsstatusVeröffentlicht - 21 März 2017

ASJC Scopus subject areas

  • Computergrafik und computergestütztes Design
  • Angewandte Informatik

Fingerprint

Untersuchen Sie die Forschungsthemen von „Data completion in building information management: electrical lines from range scans and photographs“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren