Project Details
Description
The steady-state assessment of the reactive power capability at the grid connection point takes into account the reactive power range at maximum capacity and different voltages as well as below maximum capacity and nominal voltage.
Status | Finished |
---|---|
Effective start/end date | 1/06/23 → 31/12/23 |