Crack Bridging Capacity od Bridge Deck Waterproofings

Project: Research project

Project Details

Description

To meet the specific requirements, waterproofings used for concrete bridge decks must be resistent agianst cracks coming from the concrete below the waterproofing. Otherwise, the penetrating water creates a major corrosion risk to the reinforcing steel. Different bituminous waterproofing membranes and systems have been tested.
StatusFinished
Effective start/end date1/01/9531/01/95

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.