Project Details
Description
Within the scope of this project, the production system of the cash register manufacturing is to be redesigned. Based on the optimized production concept, different variants for the future configuration of the production network will be developed and compared. Finally, the production system will be worked out in detail for the selected network configuration.
Status | Finished |
---|---|
Effective start/end date | 1/02/21 → 30/09/21 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.