Project Details
Description
In this project, based on the new pilot line, the ramp-up process to reach the planned production volumes is considered. For this purpose, on the one hand, the competences of two TU Graz institutes (IIM, FTG) are bundled to analyze and optimize the physical planning of the ramp-up stages based on simulation and, on the other hand, future-oriented automation solutions for the scaled production processes are developed.
Status | Finished |
---|---|
Effective start/end date | 1/01/22 → 30/06/22 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.