Project Details
Description
The waste water treatment plant (WWTP) of Semriach should be adapted to the state of the art. Therefore the existing flow meter of the WWTP had to be verified to find optimal design parameters.
Status | Finished |
---|---|
Effective start/end date | 17/08/06 → 15/09/06 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.