Projects per year
Original language | English |
---|---|
Title of host publication | Rock Engineering - Theory and Practice |
Place of Publication | Essen |
Publisher | VGE |
Pages | 161-166 |
ISBN (Print) | 3-7739-5995-8 |
Publication status | Published - 2004 |
Event | 2004 ISRM Regional Symposium Eurock: rock engineering, theory and practice: EUROCK 2004 - Salzburg, Austria Duration: 7 Oct 2004 → 9 Oct 2004 |
Conference
Conference | 2004 ISRM Regional Symposium Eurock: rock engineering, theory and practice |
---|---|
Abbreviated title | EUROCK 2004 |
Country/Territory | Austria |
City | Salzburg |
Period | 7/10/04 → 9/10/04 |
Other | and 53rd Geomechanics colloquy |
Projects
- 6 Finished
-
Time Dependent Displacements in Tunnel Excavation
Schubert, W. (Principal Investigator (PI))
1/03/03 → 1/01/10
Project: Research project
-
Design of Pipe Roof Support System
Volkmann, G. (Co-Investigator (CoI)) & Schubert, W. (Principal Investigator (PI))
1/01/02 → 31/12/23
Project: Research project
-
Rock Mass Characterization of Phyllites for Tunnelling (II)
Button, E. A. (Co-Investigator (CoI)), Schubert, W. (Co-Investigator (CoI)) & Riedmüller, G. (Principal Investigator (PI))
1/01/01 → 31/12/03
Project: Research project