HYDRAULICS OF THE TAIL RACE SURGE TANK OF GOUVÃES PUMPED-STORAGE HYDROPOWER

Wolfgang Richter, Gerald Zenz, Christophe Nicolet, Christian Landry, Luis de la Torre Abietar, Juan Cralos Vera Rodriguez

Publikation: Beitrag in Buch/Bericht/KonferenzbandBeitrag in einem KonferenzbandBegutachtung

Abstract

The 880 MW pumped storage hydro power plant Gouvães, part of the Alto Tâmega hydro power scheme from Iberdrola is currently under construction in the north of Portugal. The energy storage and grid regulating plant is equipped with 4 reversible Francis pump turbines with nominal power of 220 MW and a gross head of 660 m, the discharge in turbine mode is 160 m³/s and in pumping mode 128 m³/s. The current paper underlines the layout, the design criteria and the results of the physical small-scale test of the tail race surge tank in the hydraulic laboratory. Most unfavourable load cases were studied such as synchronous pump trip in resonance and multiple loading and unloading followed by full load rejection in generating mode. A collaborated transient investigation for water hammer and mass oscillation capturing was conducted and gives cross checking opportunity.
Originalspracheenglisch
Titel20th International Seminar on Hydropower Plant
Redakteure/-innenEduard Doujak, Christian Bauer
Seiten841-850
PublikationsstatusVeröffentlicht - 2018
Veranstaltung20th International Seminar on Hydropower Plants - , Österreich
Dauer: 14 Nov. 201816 Nov. 2018
https://www.viennahydro.com/

Konferenz

Konferenz20th International Seminar on Hydropower Plants
KurztitelViennahydro
Land/GebietÖsterreich
Zeitraum14/11/1816/11/18
Internetadresse

Fingerprint

Untersuchen Sie die Forschungsthemen von „HYDRAULICS OF THE TAIL RACE SURGE TANK OF GOUVÃES PUMPED-STORAGE HYDROPOWER“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren