Abstract

Correlations between calculation parameters directly influence the results of probabilistic calculations and their interpretation. In Monte Carlo simulations carried out to systematically integrate uncertainties into the calculation process, input parameter correlations are reflected by correlation coefficients and predominantly influence the chance/risk ratio and ranges of results. Correlations are usually determined indirectly by analyzing existing data series gathered from measurements, surveys, experiments etc. and investigated with respect to their linear relationship. Another option is to directly determine correlation coefficients based on expert surveys. In 2015-16, Kummer and Hofstadler conducted a survey at Graz University of Technology in which experts provided estimates of the coefficients corresponding to the correlations between certain parameters. These considerations concentrated on the labor intensity of reinforced concrete works expressed by the total labor consumption rate, which indicates the amount of labor required for reinforced concrete works per cubic meter of concrete. The total labor consumption rate of reinforced concrete works must consider all activities carried out within the system, such as shuttering, reinforcing and concreting. This paper presents and interprets survey results shown in violin plots, and M-estimators are derived to deliver sound recommendations for considering correlations when determining the total labor consumption rate of reinforced concrete works. An example demonstrates the influence of input parameter correlations on calculating the total labor consumption rate of reinforced concrete works.

Originalspracheenglisch
TitelISEC 2017 - 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction
Herausgeber (Verlag)ISEC Press
ISBN (elektronisch)9780996043748
PublikationsstatusVeröffentlicht - 2017
Veranstaltung9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017 - Valencia, Spanien
Dauer: 24 Juli 201729 Juli 2017

Konferenz

Konferenz9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2017
Land/GebietSpanien
OrtValencia
Zeitraum24/07/1729/07/17

ASJC Scopus subject areas

  • Tief- und Ingenieurbau
  • Bauwesen

Fingerprint

Untersuchen Sie die Forschungsthemen von „Probabilistic calculation of total labor consumption rate of reinforced concrete works -with and without correlations“. Zusammen bilden sie einen einzigartigen Fingerprint.

Dieses zitieren