Projects per year
- 1 - 50 out of 59 results
Search results
-
Finished
-
Stahlschwelle - Advantages and Disadvantages of steel-sleepers
6/02/23 → 31/08/23
Project: Research project
-
Rail4Future - Railways for Future: Resilient Digital Railway Systems to enhance performance
Pospischil, F., Unterweger, H., Leitner, M., Freytag, B., Veit, P. & Marschnig, S.
1/04/21 → 30/09/24
Project: Research project
-
-
Streckensperren Ostbahn - Long term effects of line-closing at the Steirische Ostbahn
1/05/19 → 31/12/19
Project: Research project
-
RailBaltica - Supplier market study for railway infrastructure components
1/05/19 → 31/12/19
Project: Research project
-
-
Optimising alignment parameters for the Murtalbahn
Neuhold, J., Smoliner, M. & Veit, P.
1/03/18 → 31/07/18
Project: Research project
-
Automated Train Operations - Traffic Management
Veit, P., Smoliner, M., Landgraf, M. & Zeiner-Holzknecht, M.
1/09/17 → 31/12/19
Project: Research project
-
-
Ostbahn - Transport Concept "Steirische Ostbahn"
Veit, P. & Smoliner, M.
1/11/16 → 30/09/17
Project: Research project
-
Radkersburg - Attraction of railway link to Radkersburg - Railway Line Spielfelld-Straß - Radkersburg; Determination of requirements for a advancement or follow-up solution
Veit, P., Fellendorf, M., Smoliner, M. & Hofer, K.
1/03/16 → 31/12/16
Project: Research project
-
Steel Logistic Systems - Modular Concept for Logistics of semi-finished and finished Products of the Steel Industry
Veit, P. & Smoliner, M.
1/07/15 → 30/06/18
Project: Research project
-
Brenner 2 - BBT - Projectoptimisation and maintenance procedure
1/01/14 → 31/12/15
Project: Research project
-
-
-
-
EU Mainline - MAINtenance, renewaL and Improvement of rail transport iNfrastructure to reduce Economic and environmental impacts
1/10/11 → 30/09/14
Project: Research project
-
-
-
-
GleisPROPHET - Gleisprognosen und planbare Häufigkeit von Erhaltungstätigkeiten
Enzi, M., Hansmann, F., Berghold, A., Veit, P. & Marschnig, S.
1/09/10 → 31/12/10
Project: Research project
-
-
LCM Projekte 2010 - LifeCycleManagement
Bauer, M., Marschnig, S., Landgraf, M., Enzi, M., Berghold, A., Hansmann, F. & Veit, P.
1/07/10 → 31/12/10
Project: Research project
-
-
-
-
Rein-Semmering - Semmering Basistunnel - Neu Auswertung und Beobachtung der Instandhaltungskosten für die Semmeringbergstrecke
Enzi, M. & Veit, P.
1/06/09 → 31/01/10
Project: Research project
-
-
Bosrucktunnel - Linz-Selzthal line Bosruck tunnel project, phase 2
1/04/08 → 31/01/09
Project: Research project
-
-
-
LCC-Tool - Entscheidungstoll für Incestitions- & Instandhaltungsentscheidungen auf Basis LCC-Beratung
Enzi, M. & Veit, P.
1/01/08 → 31/12/10
Project: Research project
-
-
ÖBB Strategy LCC
Enzi, M., Berghold, A., Marschnig, S. & Veit, P.
1/03/06 → 31/12/10
Project: Research project
-
Wels-Passau - Economic considerations of upgrading the Wels-Passau railway line
1/07/05 → 30/11/05
Project: Research project
-
Strategie Jernbaneverket NORSK - New Optimisation Research 'Spor Kwalitet'
Marschnig, S., Hummitzsch, R. & Veit, P.
1/03/05 → 30/11/10
Project: Research project
-
-
-
TRAMEO - Tr. Maint. Econ Optim - Track Maintenance Economical Optimisation
1/10/04 → 31/12/08
Project: Research project
-
-
Siemens - Projekt FXM - Quality Increase Program
Veit, P., Marschnig, S., Rießberger, K., Bauer, U. & Affenzeller, P.
1/03/03 → 21/07/08
Project: Research project
-
Wirtschaftl Bew von Neubaumeth - Strategie Neubau - Wirtschaftliche Bewertung von Neubaumethoden und -strategien
18/11/02 → 31/12/04
Project: Research project
-
-
-
Developement of Track Quality and it's Forecast
Hummitzsch, R., Veit, P. & Auer, F.
1/03/00 → 31/12/09
Project: Research project
-
-
Permanent Way - Strategy - Definition of Crossover Distances
1/01/97 → 31/01/04
Project: Research project
-
-