Project Details
Description
The widening of the border river Mur in the area of Gosdorf a few years ago with a channel parallel to the Mur shows strong siltation tendencies, which meanwhile require dredging measures. A better flow through the lateral channel would lead to higher drag stresses and thus to a tendency towards lower sedimentation.
Therefore the reconstruction of the inlet area is a reasonable measure. Numerical calculations of this area are planned in order to find the most promising solution.
Status | Finished |
---|---|
Effective start/end date | 19/05/20 → 31/12/20 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.