Project Details
Description
Within the scope of the study "110 kV cable system Tauern Tunnel", the following is discussed: task definition, requirements for the electrical components, cable laying, reliability, temperature monitoring system, calculation of magnetic induction and inductive interference, notes on testing and commissioning.
Status | Finished |
---|---|
Effective start/end date | 14/06/22 → 15/06/23 |