Projects per year
Original language | English |
---|---|
Pages (from-to) | 18-24 |
Journal | IEEE Electrical Insulation Magazine |
Volume | 25 |
Issue number | 5 |
DOIs | |
Publication status | Published - 2009 |
Projects
- 3 Finished
-
Condition Evaluation of Network Components
Muhr, H. M. (Co-Investigator (CoI)) & Sumereder, C. (Principal Investigator (PI))
1/01/02 → 31/07/15
Project: Research area
-
High-Voltage Insulating Materials and Systems
Muhr, H. M. (Co-Investigator (CoI)), Woschitz, R. (Co-Investigator (CoI)) & Sumereder, C. (Co-Investigator (CoI))
1/01/95 → 31/12/24
Project: Research area
-
Maintenance, Diagnostics and Evaluation of High-Voltage Equipments
Sumereder, C. (Co-Investigator (CoI)) & Muhr, H. M. (Co-Investigator (CoI))
1/01/95 → 31/12/24
Project: Research area