Projects per year
- 400 - 450 out of 1,498 results
Search results
-
Research project
-
Effect of the New Grading Specifications for Structural Timber on the Engineering Practice in Austria
Kernbichler, K. & Schickhofer, G.
1/01/97 → 31/01/98
Project: Research project
-
Influence of Changing Production Conditions on Binding and Leachability of Heavy Metals Out of Clinker and Cement
1/01/01 → 31/01/05
Project: Research project
-
IW 404 at sd H d Z CPH Cellulose - Cellulose-Insulation without Vapour Barrier - Investigations on the Fundamental Suitability of Sprayed-on and Plaster-covered Cellulose Insulation for Thermal Insulation of Buildings
Streicher, W., Heinz, A., Maydl, P. & Eustacchio, E.
1/02/03 → 31/08/05
Project: Research project
-
-
Thermische FE-Analysen von hochwärmegedämmten porosierten Ziegeln
1/01/98 → 31/01/01
Project: Research project
-
Quality and performance of grouting works influenced by mode of compensation and type of contract
6/10/99 → 31/10/99
Project: Research project
-
-
-
Druckglieder aus UHPC - UHPC Column
Nguyen, V. T., Sparowitz, L., Fink, E., Linder, J., Heinzle, G., Illich, G. W. & Freytag, B.
1/03/10 → 28/02/13
Project: Research project
-
-
Wild-Brücke - Bridge WILD
Santner, G., Heinzle, G., Linder, J., Reichel, M. M., Sparowitz, L. & Freytag, B.
30/10/06 → 31/12/11
Project: Research project
-
FibreScan - Zerstörungsfreie Bestimmung der richtungsabhängigen Zugtrageigenschaften von stahlfaserbewehrten Bauteilen aus UHPC
Fink, E., Santner, G., Linder, J., Fülöp, U., Heinzle, G., Holzschuster, R. & Freytag, B.
1/01/10 → 30/06/12
Project: Research project
-
Structural Analysis of Plastic Profiles for Windows
Kernbichler, K., Ferk, H. & Reichard, G.
1/02/01 → 31/01/05
Project: Research project
-
Kennzahl Entwässerung - Development of the condition of net - determination of a key figure for drainage
Landgraf, M. & Vidovic, I.
1/12/16 → 30/09/17
Project: Research project
-
-
Green_Gantry - Innovative wood solutions for stationary toll systems (gantries)
1/06/22 → 31/05/25
Project: Research project
-
-
WHB - Tests for the determination of mechanical strength and stiffness parameters
1/12/23 → 31/12/24
Project: Research project
-
ANSWER - Analysis of maintenance and inspection processes of railway infrastructure
Vidovic, I.
1/12/19 → 30/06/20
Project: Research project
-
2000_Criteria for the determination of the conservation worthiness of historical windows (part 2)
1/10/99 → 31/01/01
Project: Research project
-
-
2003_Develpoment of the Quality Manual and initial type Testing of Panels according to ETAG 009
Maydl, P., Ferk, H., Ebner, H. & Eustacchio, E.
1/01/03 → 31/10/04
Project: Research project
-
HF16-061_Assessment of the application of electric heating components in the window reveal area
Fuchs, G., Ferk, H., Rüdisser, D., Wessely, B. & Majdanac, E.
21/06/16 → 18/11/16
Project: Research project
-
-
Powerspot - Thermal bridge optimized punctual mounting system for load-bearing constructions on heat insulated facades
17/05/14 → 19/11/14
Project: Research project
-
-
HF17-174_Freewood
Ferk, H., Mosing, M., Zoller, C. G. & Leh, C.
23/11/17 → 22/11/18
Project: Research project
-
HF17-041_DeMoDach_Procedure for the detection and monitoring of moisture in flat roof constructions with EPS
Zoller, C. G., Prieling, D., Mosing, M. & Ferk, H.
18/07/17 → 17/07/18
Project: Research project
-
-
remap - reinforcement methods for additive processes
Schmid, R., Peters, S., Freytag, B., Tapley, J. P., Hansemann, G. & Trummer, A.
1/11/19 → 31/12/24
Project: Research project
-
Noise control study of an innovative ferroconcrete ceiling
Fuchs, G. & Ferk, H.
26/08/16 → 31/01/17
Project: Research project
-
-
aerowood - Scientific support in the context of the development of a wall system "aerowood" for load-bearing applications
18/08/20 → 18/08/21
Project: Research project
-
PIPECALC1 - Evaluation of numerical models for calculations of the acoustic behavior of plastic pipes
14/02/17 → 31/12/19
Project: Research project
-
HF17-003_Innovative component temperature control
Prieling, D., Vavrik-Kirchsteiger, S. & Ferk, H.
1/03/17 → 30/04/20
Project: Research project
-
-
-
Greenhouse gas balance Graz University of Technology 2012 - 2016 Focus: Module stationary energy use (electricity and heat) main campuses
Maier, S.
1/10/17 → 30/04/18
Project: Research project
-
HF16-003_Absorption Intensity Measuring Method for Noise Protection Walls
Ferk, H., Fuchs, G. & Buchegger, B.
25/01/16 → 1/12/16
Project: Research project
-
XXX_Optimized heating-band-based heating of window soffits for the prevention of mould formation. (copy)
Majdanac, E. & Ferk, H.
Project: Research project
-
HF17-182 Analysis of the breakdown safety of a hydraulic test bench wall made of sand-lime brick
Ferk, H. & Vavrik-Kirchsteiger, S.
3/10/17 → 31/12/19
Project: Research project
-
SOKOL_CLT - Tests to determine the mechanical and physical properties of CLT
1/05/21 → 30/04/22
Project: Research project
-
-
HF23-095_ReacTim - Thermally agile building planning in timber construction
1/12/23 → 30/04/26
Project: Research project
-
2005_Concept for the technical and ecological optimization of the production of a concrete masonry unit
Ebner, H., Mach, T., Ferk, H., Luschan, M., Passer, A., Eustacchio, E., Schulter, D. & Maydl, P.
1/06/05 → 30/08/06
Project: Research project
-
Pyrometric Investigation of Thermalactive Thin Coatings
Ferk, H., Höfler, K. & Gamerith, H.
1/01/02 → 31/01/05
Project: Research project
-
-
Optimization of grading for lamellas used for glulam
Jöbstl, R. & Schickhofer, G.
1/03/03 → 31/07/04
Project: Research project