Projects per year
- 50 - 89 out of 89 results
Search results
-
-
Substitution von Stahl durch UHPC - Substitution of steel by UHPC
1/10/14 → 30/09/17
Project: Research project
-
-
UHPC Brücke Lehnerz - Refurbishment of the UHPFRC-Bridge Lehnerz in Fulda
1/02/17 → 30/11/17
Project: Research project
-
-
RetroTeC - Textile Reinforced Concrete for Refurbishment and Strengthening of Traffic Structures
Nguyen, V. T., Krüger, M. & Freytag, B.
1/09/16 → 31/08/18
Project: Research project
-
ZWANG - Minimum Reinforcement Influence of Thermal Active Curing on Restraint Stresses in the Hardening Phase and Superposition of Deformation Impacts
10/10/11 → 31/12/18
Project: Research project
-
Hybrid-Mast - Design concept for tall transmission towers in concrete-steel-hybrid construction
1/03/18 → 31/12/18
Project: Research project
-
COEBRO - Additive Fabrication of Concrete Elements by Robots
Freytag, B., Nguyen, V. T., Peters, S., Hansemann, G., Schmid, R., Pirker, E. M., Pichlkastner, C., Sliskovic, V., Tapley, J. P., Kim, H. H., Holzinger, C., Trummer, A. & Schraml, D.
1/09/15 → 31/01/19
Project: Research project
-
Vorsatzschale - Investigation of a concrete facing with a single layer of reinforcement for the refurbishment of shipping locks
1/07/18 → 30/06/19
Project: Research project
-
-
-
-
-
UHPC Austria - UHPC Austria
Nguyen, V. T., Freytag, B. & Juhart, J.
1/07/19 → 30/06/20
Project: Research project
-
RealStress - Restraint forces in concrete structures under SLS and ULS loading with special regard of real member behaviour
30/06/18 → 31/07/20
Project: Research project
-
-
3D-Gebäudemodelle - Realistic Consideration of structural behaviour with 3D-Modelling
1/09/17 → 31/08/20
Project: Research project
-
Vorsatzschalenbewehrung - Investigation oft he required reinforcement in concrete facing layers
1/01/20 → 30/09/20
Project: Research project
-
-
Tragfähigkeitssteigerung - Research on the combination of AVI-DS-Elements with shear bolts to increase punching shear resistance
1/06/20 → 31/12/20
Project: Research project
-
KWT - Behaviour of fibre reinforced elements using kwt-steel fibres
13/11/20 → 31/03/21
Project: Research project
-
-
FrankfurtFour - Building Project "New building 60547 FOUR"
1/08/21 → 31/12/21
Project: Research project
-
-
DW2 - Thermally improved diaphragm walls
Nguyen, V. T., Passer, A., Rebhan, M. & Schlicke, D.
3/08/20 → 30/04/22
Project: Research project
-
Neue Betonrezepturen - Creation of new concrete formulations
1/02/22 → 30/06/22
Project: Research project
-
Verbundstütze - Normal strength concrete-UHPC-composite column
1/01/19 → 30/06/22
Project: Research project
-
FWF - Querkraft - Systematic study on the shear behavior of RC members
1/10/19 → 30/09/22
Project: Research project
-
Göltzschtalbrücke - BAB A 72 Preservation measure D46RL
Freytag, B., Nguyen, V. T. & Schlicke, D.
1/08/21 → 30/09/22
Project: Research project
-
CPC Zulassung - CPC declaration of approval for new concrete
20/05/22 → 31/12/22
Project: Research project
-
BBT - Massige Bauteile - Munich-Verona railroad axis, Brenner base tunnel, verification of the quality assurance of massive components
27/05/22 → 31/12/22
Project: Research project
-
AVI-TK Dehnfugenabstand - Small-scale tests on combined cyclic and static loading of the AVI-TK
Gheorghiu, D.
12/01/23 → 31/03/23
Project: Research project
-
-
OptTempLowCarb - Target-oriented production of components with temperature- and CO2-optimized concrete
1/02/23 → 31/01/24
Project: Research project
-
Upcycling Fahrbahnplatten - Upcycling of roadway slabs with CO2 storage
1/04/23 → 31/03/24
Project: Research project
-
Faserbetontübbinge - Formation of a basis for the use of fibre-reinforced concrete segments in Austria
1/04/21 → 31/03/24
Project: Research project
-
MRZ Rissbreitenbegrenzung - Revision of the Guideline "Crack Control for restraint stresses in massive hydraulic members (MRZ)"
1/10/23 → 31/03/24
Project: Research project