Projects per year
- 1 - 50 out of 208 results
Search results
-
3DWelding - Additive Manufacturing of Structural Steel Elements
Enzinger, N., Peters, S., Freytag, B. & Holzinger, C.
1/01/20 → 30/09/22
Project: Research project
-
-
-
ABS-Network - Aluminium Building Skins - Energy Active Facades Network
Schober, H., Hochenauer, C., Domitner, J., Brandl, D. & Mach, T.
1/06/17 → 31/07/19
Project: Research project
-
-
-
-
Advanced Chain Welding (JOIN4+ 2.3)
Enzinger, N. & Mucic, K.
1/06/10 → 31/05/14
Project: Research project
-
AF_CAMed - Clinical Additive Manufacturing for Medical Applications
1/10/21 → 30/09/22
Project: Research project
-
-
-
AluForm - Experimental and Numerical Investigations on the Deep-drawability of New Aluminum Alloys
1/05/20 → 30/04/23
Project: Research project
-
-
-
AluTool - Design of a Test Tool for Characterizing the Deep-drawability of Aluminum Sheets
1/03/19 → 31/12/19
Project: Research project
-
-
-
AMAG MCL - Modelling of microstructure evolution during cold rolling and contiuous solution annealing of alumniumalloys
1/04/12 → 31/03/15
Project: Research project
-
AMNibas - Wire based additive fabrication of NiBas Inconel with electron beam
1/08/21 → 31/03/22
Project: Research project
-
AM Tool - Wire based Additive Manufacturing of tool components
1/01/18 → 31/12/21
Project: Research project
-
Analysis of mechanisms and kinetics of decarburization of spring steels as a basis for industrial consequences (MCL M9)
Kozeschnik, E. & Li, D.
1/07/04 → 30/09/06
Project: Research project
-
AURA - Development of pool roofings on the basis of walk-on-water-technology
1/05/14 → 31/05/15
Project: Research project
-
Bases for the Development of Nickelbase Flux-Cored Wires (MCL-J1)
Buchmayr, B. & Vallant, R.
1/01/99 → 1/01/03
Project: Research project
-
Best Practice Solutions regarding quality requirements for fusion welding of metallic materials based on ISO 3834 for welding companies (JOIN E.2)
Weinberger, T. & Enzinger, N.
9/10/07 → 31/12/09
Project: Research project
-
-
BioTiMod - Surface modification of titanium alloys to improve the biocompatibility of implants
Warchomicka, F. G. & Ramskogler, C.
1/03/14 → 29/02/16
Project: Research project
-
CarbonNanoMCW - High Strength Aluminium Metal Cored Wire for Beam based Additive Layer Manufacturing
1/07/18 → 30/06/19
Project: Research project
-
-
CD-Laboratory for Computermodellierung werkstoffkundlicher Vorgänge und Verarbeitungstechnolgien
Buchmayr, B.
1/07/91 → 30/06/98
Project: Research project
-
CD-Laboratory for Computermodellierung werkstoffkundlicher Vorgänge und Verarbeitungstechnologie, Module: FEM calculation of the development of the residual stresses due to production in new heat resistant cast steels
Enzinger, N. & Buchmayr, B.
17/12/97 → 30/06/98
Project: Research project
-
CD-Laboratory for Computermodellierung werkstoffkundlicher Vorgänge und Verarbeitungstechnologie, Module: Numerical simulation of the microstructural development of nickel-base-alloys during a hot deformation process
Buchmayr, B. & Sommitsch, C.
1/07/95 → 31/12/98
Project: Research project
-
CD-Laboratory for Design of high-performance alloys by thermomechanical processing
Poletti, M. C., Buzolin, R. H., Wang, R., Godavarthy Anantha Venkata, R. K. P., Miller Branco Ferraz, F., Fortmüller, S. & Baumann, G.
1/05/17 → 30/04/24
Project: Research project
-
-
CD-Laboratory for Materials and Simulation Modul 3: Lifetime prediction of tools made of hot work steels
Sommitsch, C. & Krumphals, F.
1/01/07 → 31/01/13
Project: Research project
-
CD-Laboratory for Materials Modelling and Simulation
Friedl, T., Hadzic, S., Timoshenkov, A., Herbitschek, L., Kuduzovic, A., Penker, H., Krumphals, F., Krumphals, A. & Sommitsch, C.
1/02/06 → 31/01/13
Project: Research project
-
CD-Laboratory for Materials Modelling and Simulation, Module 2: Microstructure modelling of the alpha-beta-titanium alloy Ti-6Al-4V during thermo-mechanical heat treatment
Krumphals, A. & Sommitsch, C.
1/01/09 → 31/01/13
Project: Research project
-
CD-Laboratory for Materials Modelling and Simulation, Module 5: Online simulation of seamless pipe production within the process chain
Timoshenkov, A. & Sommitsch, C.
1/01/10 → 31/12/13
Project: Research project
-
CD-Laboratory for Materials Modelling and Simulation, Module 6: Development of ultra high strength steels for bolts and fasteners in automotive industry
Kuduzovic, A.
1/01/10 → 31/01/13
Project: Research project
-
CD-Laboratory for Materials Modelling and Simulation, Module 7: Process advance of heavy steel component casting by reduction of hot-tear-defect-volume
Sommitsch, C. & Hadzic, S.
1/10/09 → 31/01/13
Project: Research project
-
Characterisation and Simulation of Precipitation Processes in novel Tool Steels (MCL SP16)
Kozeschnik, E. & Sonderegger, B.
1/02/04 → 31/01/07
Project: Research project
-
Characterization, optimization and modelling of friction welding process for large cross-sections (JOIN C.2)
Cerjak, H., Penker, H., Kozeschnik, E. & Maalekian, M.
1/07/05 → 31/01/07
Project: Research project
-
Characterization of Cold- and Warm-Formability of Metallic Materials (MCL-SP3)
Rindler, W., Buchmayr, B., Ofenheimer, A. & Kozeschnik, E.
1/03/00 → 28/02/02
Project: Research project
-
Charakterisierung d Substruktur - Characterisation of the Substructure of Modern Power Plant Materials Using the EBSD Method
1/10/01 → 30/09/04
Project: Research project
-
Comparison of measured and with FEM calculated residual stresses due to welding of austenitic stainless hoop welds
1/06/95 → 31/12/95
Project: Research project
-
Computer Modelling of Precipitation Kinetics in Multi-Component Materials (MCL-SP11)
Kozeschnik, E. & Buchmayr, B.
1/07/01 → 30/06/04
Project: Research project
-
-
Computer simulation of precipitation kinetics in solid metals and application to the complex power plant steel CB8
Rajek, H. J. & Cerjak, H.
1/07/01 → 1/11/04
Project: Research project
-
Coordination of Advanced Creep Activities to Improve Safety and Durability of High Temperature Plant Materials
16/09/01 → 15/09/05
Project: Research project
-
CRESTA2 - New Creep Resistant Stable Steel for USC Power Plant
1/07/14 → 31/12/18
Project: Research project
-
CTFM - Creep Testing of Forged Grade 91 and Grade 92 Base Material - CTFM
Mayr, P.
1/07/08 → 31/01/11
Project: Research project