Rock Mass Characterization of Phyllites for Tunneling
Schubert, W. & Riedmüller, G.
1/01/96 → 31/01/97
Project: Research project
-
Development of a new supporting yielding steel element for tunnel linings in squeezing rock mass
Moritz, A. B. & Schubert, W.
1/12/96 → 31/12/98
Project: Research project
-
Development of a new supporting yielding steel element for tunnel linings in squeezing rock mass
Moritz, A. B.
1/12/96 → 31/12/98
Project: Research area
-
Numerical Simulation in Tunnelling
Schubert, W., Schweiger, H., Beer, G., Golser, H., Riedmüller, G., Opriessnig, G., Gaich, A., Semprich, S., Schuller-Kovásznay, H., Fasching, A. & Gruber, F. J.
1/05/97 → 31/01/01
Project: Research project
-
Rock Mass Characterization of Phyllites for Tunnelling (II)
Button, E. A., Schubert, W. & Riedmüller, G.
1/01/01 → 31/12/03
Project: Research project
-
Stability prediction for slopes and hillsides
Semprich, S., Schubert, W., Steger, G., Scharinger, F., Leibniz, O., Grossauer, K., Leitner, R., Lenzi, M. & Blümel, M.
1/02/06 → 30/11/06
Project: Research project
-
Development of calculation models for keyblock analyses in open pit and subsurface engineering
1/04/03 → 30/04/07
Project: Research project
-
EU - TUNConstruct - Technology Innovation in Underground Construction
Carvalho dos Prazeres, P. G., Lammerer, W., Riederer, K., Zechner, J., Beer, G., Grossauer, K., Schubert, W., Maues Brabo Pereira, A., Pilgerstorfer, T., Dünser, C., Kavelar, E. & Radoncic, N.
1/09/05 → 31/08/09
Project: Research project
-
-
Influence of Block Size and Shape on the Deformation Behaviour and Stress Development around Tunnels
Pötsch, M., Solak, T. & Schubert, W.
1/02/03 → 1/01/10
Project: Research project
-
Automatic Evaluation of Displacement Monitoring Data
Grossauer, K. & Schubert, W.
1/09/05 → 1/01/10
Project: Research project
-
A Hierarchical Rock Mass Characterization for Tunnel Design & A Deterministic and Probabilistic Approach
Schubert, W. & Goricki, A.
1/01/00 → 1/01/10
Project: Research project
-
-
-
-
Determination of Round Length for Tunnels in Weak Rock
Lee, Y. & Schubert, W.
1/05/05 → 1/01/10
Project: Research project
-
Mönchsberggarage - Expension Mönchsberggarage laboratory tests
27/09/13 → 30/04/14
Project: Research project
-
FOS - Gebirgsdruck - Fiber-optically supported measuring methods of observation of mountain pressure
Buchmayer, F. S. & Marcher, T.
1/01/17 → 30/06/18
Project: Research project
-
SAQREAST - Stability analysis of the quarry Rabenwald, quarry face east
Buyer, A. A.
18/07/18 → 31/01/19
Project: Research project
-
ROCKBURST - Devastating micro cracks: researching spontaneous rock failure with rock mechanical testing, μCT, OBIA and geostatistics
Schubert, W., Dietzel, M., Gottsbacher, L. & Marcher, T.
1/05/16 → 30/07/19
Project: Research project
-
SAQREAST-2 - Stability analysis of the quarry Rabenwald, quarry face east
13/09/19 → 10/10/19
Project: Research project
-
KW Obervellach II - Laboratory test program rock mechanics for exploration program II
Marte, R., Latal, C. & Blümel, M.
31/08/18 → 31/12/19
Project: Research project
-
Big Tunnels - Big Data - AI based rock mass classification in tunnelling
21/02/19 → 21/02/20
Project: Research project
-
MaLMoCT.1 - Applicability of Machine Learning methods to geotechnical monitoring data in conventional tunneling projects
26/03/19 → 26/03/20
Project: Research project
-
ThermoCluster BBT - Vorstudie - Reasonable use of climate-friendly tunnel-thermic energy at the Brenner Base Tunnel: Study of project documents and literature study
21/11/19 → 30/04/20
Project: Research project
-
Lab-RMT-Rock bolt pull out resin - Laboratory tests (rock mechanical): Rock bolt pull out tests resin
1/07/20 → 30/11/20
Project: Research project
-
Lab-RMT-IAG-Angerberg - Laboratory tests (rock mechanical, mineralogical): Angerberg, cavern drillings
1/01/21 → 1/09/21
Project: Research project
-
STEIRIS001 - Municipal roads - Risk of natural rock fall
Kluckner, A., Hofstadler, C. & Marcher, T.
1/09/21 → 30/06/22
Project: Research project
-
A26 - Phase 02 - Carrying out soil mechanics laboratory tests to determine the swelling behaviour - Laboratory Tests - Drilling Phase 5a
1/01/22 → 31/07/22
Project: Research project
-
Lab-RMT-IAG_Köstendorf-Salzburg - Laboratory tests (rock mechanical, mineralogical): new railway line Köstendorf-Salzburg
1/10/20 → 31/12/22
Project: Research project
-
MachWas001 - Rock mechanical feasibility study power plant
1/07/21 → 31/12/22
Project: Research project
-
AST_Stockholm - Citylink - Anneberg Skanstull Tunnel - Stockholm
Kaspar, M. & Frühwirt, T.
8/08/22 → 31/12/22
Project: Research project
-
PotKasp001 - Potential study on the use of rock caverns as a large-scale heat reservoir
10/01/22 → 9/01/23
Project: Research project
-
DrillData-ML001 - Analysis of drilling machine data with Machine Learning (ML) - Phase 1: Feasibility study on available ML algorithms
1/09/22 → 31/03/23
Project: Research project
-
Untergrund - Rumänien - Quellversuche Rumänien
Frühwirt, T. & Rebhan, M.
1/08/22 → 30/04/23
Project: Research project
-
Prediction of Displacements in Tunnelling
Radoncic, N., Pilgerstorfer, T., Seidl, C. & Schubert, W.
1/12/96 → 31/12/23
Project: Research project
-
Modelling of Rock Mass Behaviour
Radoncic, N., Pilgerstorfer, T., Schubert, W. & Seidl, C.
1/12/92 → 31/12/23
Project: Research project
-
KW Hinterberg - Hydraulik Power Station Hinterberg
Kaspar, M., Frühwirt, T. & Rebhan, M.
16/11/22 → 31/12/23
Project: Research project
-
SecondoTuboGotthard - Gotthard Tunnel, 2nd Tube - Rockmechanical Laboratory Testing
Frühwirt, T.
8/03/23 → 31/12/23
Project: Research project
-
Design of Pipe Roof Support System
Volkmann, G. & Schubert, W.
1/01/02 → 31/12/23
Project: Research project
-
Tunnelling in poor and faulted Rock Mass
Pötsch, M., Golser, H., Button, E. A., Moritz, A. B., Sellner, P. J., Pilgerstorfer, T. & Schubert, W.
1/10/92 → 31/12/23
Project: Research project
-
Mühlauer Quelle - Rock Mechanical Tests and Consulting for the Project "Spring Mühlau" in Innsbruck
Latal, C., Frühwirt, T. & Rebhan, M.
6/04/23 → 31/12/23
Project: Research project
-
Lünersee II - Lünerseewerk II
Rebhan, M., Latal, C. & Frühwirt, T.
18/04/23 → 31/12/23
Project: Research project
-
SFH - Salzburger Festspielhäuser / site investigation Salzburger Festspielhäuser - core drillings
Frühwirt, T., Latal, C. & Rebhan, M.
16/02/23 → 31/01/24
Project: Research project
-
vkw_LÜW_II_Bürs - Lünerseewerk II - Sondierstollen Bürs
Latal, C. & Frühwirt, T.
18/09/23 → 30/06/24
Project: Research project
-
GaSIm - Ground and Soil Improvement Modelling
Schlicke, D., Unterlaß, P. J., Rebhan, M. & Leo, J.
1/11/23 → 31/10/24
Project: Research project
-
ChaMod-HSSR - Characterization and modelling of hard soil / soft rock considering anisotropy and swelling
Kluckner, A. & Metzler, I.
1/10/22 → 30/09/25
Project: Research project
-
Rohbaustollen Angath - Line 30201/10104 / National Border - Wörgl / Wörgl - Innsbruck 4 - track extension Schaftenau - Radfeld - Construction lot T4.2 Angath roughwork tunnel Rock mechanical and mineralogical-petrographic laboratory investigations
Frühwirt, T., Rebhan, M. & Latal, C.
15/11/23 → 31/12/25
Project: Research project