Projects per year
- 1 - 50 out of 145 results
Search results
-
Finished
Lünersee II - Lünerseewerk II
Rebhan, M., Latal, C. & Frühwirt, T.
18/04/23 → 31/12/23
Project: Research project
-
Mühlauer Quelle - Rock Mechanical Tests and Consulting for the Project "Spring Mühlau" in Innsbruck
Latal, C., Frühwirt, T. & Rebhan, M.
6/04/23 → 31/12/23
Project: Research project
-
SFH - Salzburger Festspielhäuser / site investigation Salzburger Festspielhäuser - core drillings
Frühwirt, T., Latal, C. & Rebhan, M.
16/02/23 → 31/01/24
Project: Research project
-
Mobiles Fluorometer - Determination of Flow quantities and behavior of the HS medium PASP in the Koralmt tunnel
1/02/23 → 28/02/24
Project: Research project
-
KW Hinterberg - Hydraulik Power Station Hinterberg
Kaspar, M., Frühwirt, T. & Rebhan, M.
16/11/22 → 31/12/23
Project: Research project
-
Kufstein - Schaftenau - Trainline extension of the Austrian border between Kufstein and Schaftenau
1/10/22 → 31/05/23
Project: Research project
-
AST_Stockholm - Citylink - Anneberg Skanstull Tunnel - Stockholm
Kaspar, M. & Frühwirt, T.
8/08/22 → 31/12/22
Project: Research project
-
CarbDown - Orientating tests for the decarbonatization of clay materials Laboratory experiments and computer modeling
1/07/22 → 31/03/23
Project: Research project
-
-
Clumped isotopes - Clumped isotopes in carbonate minerals
1/10/21 → 28/02/23
Project: Research project
-
ARC Juraj Projekt - Glauconite: Archive Recording Timinig and Triggers of Cambrian Radiation
1/04/21 → 31/03/23
Project: Research project
-
AAVAS - Alkali Activated Slags
Vallazza-Grengg, C. & Mittermayr, F.
11/02/21 → 31/03/21
Project: Research project
-
UpcycSlag-Binder - Upcycling of slag residues to new, sustainable binders in the construction materials cycle
1/01/21 → 30/06/23
Project: Research project
-
Lab-RMT-IAG-Angerberg - Laboratory tests (rock mechanical, mineralogical): Angerberg, cavern drillings
1/01/21 → 1/09/21
Project: Research project
-
Annaberg - Chemical and mineralogical investigations for the evaluation of the Annaberg railway tunnel
16/10/20 → 15/03/21
Project: Research project
-
Lab-RMT-IAG_Köstendorf-Salzburg - Laboratory tests (rock mechanical, mineralogical): new railway line Köstendorf-Salzburg
1/10/20 → 31/12/22
Project: Research project
-
LumAConM - High-resolution, imaging measurement analysis for mineral building materials LumAConM
Mittermayr, F., Dietzel, M., Mayr, T. & Sakoparnig, M.
1/02/20 → 31/07/23
Project: Research project
-
-
PITS: PITS - Parameter identification by means of in-situ tests in silty soils
Dietzel, M. & Oberhollenzer, S.
1/09/19 → 31/12/22
Project: Research project
-
S18 Schnellstraße - S18 Bodensee Mainroad - Abrasivity and Mineralogical testing
Latal, C., Rebhan, M. & Kien, K. C.
1/08/19 → 31/05/20
Project: Research project
-
-
-
-
FWF - Met-Proxies - Met-Proxies-Metal isotopes as environmental proxies
Mavromatis, V.
1/05/19 → 30/04/22
Project: Research project
-
-
BioResComp - Biogenic corrosion resistant geopolymer - concrete composites for sewer applications
Vallazza-Grengg, C., Freytag, B. & Juhart, J.
1/03/19 → 28/02/22
Project: Research project
-
KW Obervellach II - Laboratory test program rock mechanics for exploration program II
Marte, R., Latal, C. & Blümel, M.
31/08/18 → 31/12/19
Project: Research project
-
-
FWF - Amorphous - Formation Mechanisms of Carbonates via Amorphous Precursors
Purgstaller, B.
1/10/17 → 28/02/21
Project: Research project
-
-
Versinterungsprojekt - Sinter formation in the Semmering tunnels: Analyses Monitoring Modelling Emergency concepts
1/07/17 → 30/06/18
Project: Research project
-
PolyDrain - Optimization of Polymer-Tube Material for efficient drainage systems in tunnel constructions
1/07/17 → 30/09/20
Project: Research project
-
FWF - Charon II - Mechanisms controlling the formation and diagenetic alteration of carbonates
1/02/17 → 31/08/21
Project: Research project
-
-
MICC - Microbial induced concrete corrosion in wastewater facilities (MICC)
1/01/17 → 31/12/18
Project: Research project
-
Mechanisms controlling the formation and diagenetic alteration of carbonates
1/10/16 → 31/08/19
Project: Research project
-
-
-
ROCKBURST - Devastating micro cracks: researching spontaneous rock failure with rock mechanical testing, μCT, OBIA and geostatistics
Schubert, W., Dietzel, M., Gottsbacher, L. & Marcher, T.
1/05/16 → 30/07/19
Project: Research project
-
KAT2 Versinterung - Koralmbahn Graz - Klagenfurt - Sinter formation
1/01/16 → 1/06/19
Project: Research project
-
Semmering-Basistunnel neu 2 - Semmering-Basistunnel new Project G15131
1/09/15 → 31/08/23
Project: Research project
-
-
Befliegung Deponie Grub - Koralmbahn Graz-Klagenfurt, contract section KAT2 section Deutschlandsberg - St. Andrä landfill Grub Befliegung Deponie Grub
26/11/14 → 30/06/15
Project: Research project
-
RHI-Bindungssysteme - Preliminary study for development of a new binding system for carbonaceous, basic refractory products
1/10/14 → 30/09/15
Project: Research project
-
-
NoScale - Characterization of deep groundwater to prevent precipitation processes (scaling) and corrosion of geothermal plants
1/02/14 → 31/07/16
Project: Research project
-
Mönchsberggarage - Expension Mönchsberggarage laboratory tests
27/09/13 → 30/04/14
Project: Research project
-
ERESCON - New concretes in the fields of infrastructures, energy- and resources-optimized
Passer, A., Klammer, D., Juhart, J. & Fischer, G.
1/09/13 → 31/08/15
Project: Research project